30 July 2007

Everything is prepared for the floor slab on top of the HAART Clinic to be cast.

The kitchen, dining room and lounge area ready to be demolished to be replaced
by a new construction which is strong enough to carry two more stories on top.
Back to the homepage of the Brotherhood of Blessed
Gérard
![]()
This page was last updated on Tuesday, 15 January 2013 12:49:48